Energy Supply of Leningrad before the Blockade of the City: Planning Miscalculations and Their Consequences
DOI:
https://doi.org/10.22394/1726-1139-2024-2-190-197Keywords:
Leningrad, energy system, mobilization measures, Soviet-Finnish WarAbstract
The article analyzes the main factors and reasons for the decrease in the working capacity of the Leningrad power system before the outbreak of the Great Patriotic War, at the same time, it assesses the readiness of city services for the hardest military tests that befell the residents of the city. According to the authors of the publication, the leadership of Leningrad in the late 1930s, due to a number of circumstances, both objective and subjective, could not take adequate organizational and technological measures to expand production and develop the energy infrastructure of the region. As a result, by the beginning of the war, the Leningrad power system was technologically and organizationally insufficiently prepared for a complete or partial blockade of the city.Downloads
References
Груздев В. Б., Ежов В. А. Подвиг ленинградских энергетиков в годы блокады // Вопросы истории. 1985. № 4. С. 101–107. EDN JVTDQL
Килин Ю. М. Карелия в политике Советского государства: 1920–1941. Петрозаводск, 1999. 276 с.
Оборона Ленинграда 1941–1944. Воспоминания и дневники участников. Л., 1968. 792 с.
Тягур М. И. Ленинград во время советско-финляндской войны 1939–1940 годов: трансформация повседневной и хозяйственной жизни города // Вестник Пермского университета. Сер. 2. История. 2016. № 2 (33). С. 79–86. DOI: 10.17072/2219-3111-2016-2-79-86
Sutton A. Western technology and Soviet economic development. 1930 to 1945. Stanford: Hoover Institution Press Stanford University, 1971. 401 р.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Avdanin V.V., lushin A.I.

This work is licensed under a Creative Commons Attribution 4.0 International License.
How to Cite
Коды статьи
- EDN DUJSKW
- Тип статьи (РИНЦ) Научная статья (Научная статья)